Gallery

1. Bricky Scaffold2 X 1700 Frames 675 KG heavy duty scaffold, Block work 35 KG per corner stone.
2. Safe High-Ts12 Surrey St. Norlane 3214 Geelong.
3. Carpenters / RenderingAccess for trade on 4 levels limited face bracesto suit renderer
4. Scaffold Collins St. Melb.Renovation stone facade on bank building 34 meters to top deck 17 working floors.
5. ANZ Bank MelbourneWide and narrow frame scaffold being erected for stone mason in Melbourne CBD.
6. Stone Mason ScaffoldDifferent angle for repair works to stone face.
7. Slate Roof AccessReplacing of air vents Scot's Church Melbourne
8. Stone Mason ScaffoldAccess to stone face for repair works Simple scaffold for set up.
9. Bird CageAccess to Ballarat railway station stone mason repair work.
10. Scaffold for CladdingScaffold without face bracing anable builders to clad walls.
11. Scaffold for Steel set upScaffold erected prior to steel craned in.
12. Deck to Suit BuilderScaffold erected prior to steel craned in.
13. Wide to Narrow ScaffoldWide set over fence due to restricted space, narrow to suit roofer.
14. ShoringScaffold used for shoring 700sq Mtr Then used for normal scaffold outside of building.
15. Shoring/ProppingSet up for pouring suspended concrete flooring, or propping old building flooring.
16. Note Frame SizesSloping ground, various frame sizes used to achieve level.
17. Various Frames SizesSet up for unlevel ground, extreme to 30 degree
18. Off Set Frame1514mm Frame to be used from wide to narrow or narrow to wide 5 to 3 Boards
19. Roof ReworkScaffold to suit roof tiling, scaffold erected on cordova roof tiles.
20. Scaffold 5 Frames HighScaffold 10 meters to deck hight.
21. Roof ReworkScaffold to suit roof tiling, scaffold erected on roof tiles.
22. Roof Access PlatformSingle section, Access to double storey from lower roof, suit most situations.
23. Roof Access FrameAccess frame to double storey from lower roof, suit most situations.
24. Tiled RoofAccess for replacing facia and spouting on double storey section.
25. Slate Roof AccessNo guy wants to know without distroying it (We can do it)
26. Access StairsStyles can cater for various widths of treats. 510 -1.830mm
27. 2 mtr Section StairsMultiple sections of 2 mtr stairs within 1.8 Mtr bays
28. Fully Gavanized TrailerTandem to fit 9 bay,s not exceeding 2 ton includes weight of trailer / trailer capable to carry 2.8 ton with breakaway system.28
29. Trailer PackageTandem 11 bay,s exceeding 2 ton includes weight of trailer / trailer capable to carry 2.8 ton with breakaway system.
30. Trailer PackageTandem with 11 bay,s / trailer capable to carry 2.8 ton with breakaway system.
31. Bricky ScaffoldSingle lift with guard rail 1.5 mtr high heavy duty suit all bricklayer
32. Scaffold 3 DecksScaffold 3 working decks, medium duty.
33. Scaffold 3 DecksScaffold 3 working decks, medium duty with closing frame ends.
34. Garden AccessScaffold friendly without distroying garden.
35. 2 Frames Walk ThroughSet up for entry into building and walk trough side of house.
36. Limited AccessSet between 2 houses to reach spout and facia replacement and painting.
37. Mobile Tower 2.7mtrFully galvenized mobil tower 2.65 mtr, to suit floor set up of trusses.
38. Mobile Tower 4mtrMobile tower 2 frames access to 4mtr working floor.
39. Narrow Mobile TowerNarrow with ladder frame and access floor to 4.5 mtr and outriggers.
40. Scaffold Mobile Tower2.4 x 1.8 base with hop ups 3.6 mtr, 6 board 1.5mtr wide floor.
41. Scaffold for BricklayersCorrect Height Suit Eaves
42. Suit Eaves & Brickwork6mtr to Eaves and Brick Finish

master150

Save Money & Time
© Safe High-Ts Australia Pty. Ltd.
12 Surrey Street, Geelong. Victoria, Australia 3215.

Phone : +61 3 5277 0422 Fax : +61 3 5277 0433
Email : This email address is being protected from spambots. You need JavaScript enabled to view it.

 

master150